| Skip to main content | Skip to sub navigation |

This is now an inactive research group it's members have moved on. You can find them at their new research groups:

ECS Intranet:
Continuous Online PD Monitoring for HV Cables


This project is concerned with the development of a novel technique for the remote inspection and monitoring of partial discharge events in high voltage cable systems using an optical network. The measurement mechanism uses the capacitive coupler-measured PD signal and applies it across an electro-optic modulator (EOM), which modulates the intensity of the transmitted laser light as an approximately linear function of the voltage applied across it. The optical network supplies polarised laser light via optical fiber to the EOM input, and monitors the optical output from the modulator using an high speed optical receiver. The EOM is compact and passive requiring no power to operate.

Type: Normal Research Project
Research Groups: Electrical Power Engineering, Electronics and Electrical Engineering
Themes: High Voltage Engineering, High Voltage Engineering, High Voltage Engineering
Dates: 1st October 2002 to 30th September 2005

Partners

Funding

Principal Investigators

URI: http://id.ecs.soton.ac.uk/project/191
RDF: http://rdf.ecs.soton.ac.uk/project/191

More information

You can edit the record for this project by visiting http://secure.ecs.soton.ac.uk/db/projects/editproj.php?project=191